PROJECTS

Highway 371 North Project(2012-2013)
Highway 371 North Project 
371 Draft Layout(03/14/11)

Pedestrian Tunnel under Hwy 371(2013)
371/18 Committee Meetings are the 2nd Wednesday of the month from 4:00-6:00 pm.
Pedestrian/Bicycle Access Area Site Plan (12/14/11)
Design Development Report (12/14/11)
Historical Development Overview(12/14/11)
Latest 371 Layout with pedestrian tunnel - Aerial view (11/7/11)
Lake Connection Aerial w/o bldg Concept C 09/08/11
Lake Connection Aerial with bldg Concept C 09/08/11
Alternative Pedestrian Tunnel Location: Concept C (South Overlook w/o bldg) 09/08/11
Alternative Tunnel Location: Concept C (West Overlook w/o bldg) 09/08/11
Alternative Tunnel Location: Concept C (South Overlook with bldg) 09/08/11
Alternative Tunnel Location: Concept C (West Overlook with bldg) 09/08/11
View from Tunnel
Alternative Pedestrian Tunnel Location  Concept B 07/19/11
View from Downtown Entrance Concept A (MnDOT location) (03/11)
View from A. & J. Johnson Nisswa Lake Park Concept A (MnDOT location) (03/11)
MnDOT Contact: James Hallgren 218.828.5797
City Contact: Loren Wickham 218.963.4444

C.S.A.H. 18 Realignment(2012)
County Road 18(CSAH) Realignment
(2012)
Draft Alignment Map (04/27/11)
Crow Wing County Contact: Luke Wehseler 218.824.1110
City Contact: Loren Wickham 218.963.4444

Smiley Road(South Main) Reconstruction (2012-2013)
Smiley Road/South Main Section - Alternative D  09/06/11
Smiley Road/South Main Section options

A. & J. Johnson Nisswa Lake Park

 

HOME