
PROJECTS
Highway 371 North Project(2012-2013)
Highway 371 North Project
371 Draft
Layout(03/14/11)
Pedestrian Tunnel under Hwy 371(2013)
371/18 Committee Meetings are the 2nd Wednesday of the month from 4:00-6:00 pm.
Pedestrian/Bicycle Access Area Site Plan (12/14/11)
Design Development Report (12/14/11)
Historical Development Overview(12/14/11)
Latest 371
Layout with pedestrian tunnel - Aerial view (11/7/11)
Lake Connection Aerial w/o bldg Concept C 09/08/11
Lake Connection Aerial with bldg Concept C 09/08/11
Alternative Pedestrian Tunnel Location: Concept C (South Overlook
w/o bldg) 09/08/11
Alternative Tunnel Location: Concept C
(West Overlook w/o bldg) 09/08/11
Alternative Tunnel Location: Concept C (South Overlook with bldg) 09/08/11
Alternative Tunnel Location: Concept C (West Overlook with bldg) 09/08/11
View from Tunnel
Alternative Pedestrian Tunnel Location Concept B 07/19/11
View from Downtown Entrance Concept A (MnDOT location) (03/11)
View from A. & J. Johnson Nisswa Lake Park Concept A (MnDOT location)
(03/11)
MnDOT Contact:
James Hallgren 218.828.5797
City Contact:
Loren
Wickham 218.963.4444
C.S.A.H. 18 Realignment(2012)
County Road 18(CSAH) Realignment
(2012)
Draft Alignment Map (04/27/11)
Crow Wing County Contact:
Luke Wehseler 218.824.1110
City Contact:
Loren Wickham 218.963.4444
Smiley Road(South Main) Reconstruction (2012-2013)
Smiley Road/South Main Section - Alternative D 09/06/11
Smiley
Road/South Main Section options
A. & J. Johnson Nisswa Lake
Park